Sök:

Sökresultat:

2061 Uppsatser om Timber construction - Sida 1 av 138

Kostnadsutvecklingen inom flottningen i Dalälven 1900-1970

The paper, with a brief summary of timber floating in Sweden and also of some previous re-search in this field, contains a study on costs for timber-floating in the river Dalälven located in central Sweden. The public used timber-floating system in Dalälven and the historical background about this activity is described. The study is focused on the total costs for timber-floating in the public open floating system in Dalälven from 1900 to 1970, the year before the timber-floating was definitively closed down. Also the costs for separating the logs of a specific owner when they reached the point where they could be separated from the timber of other owners are analyzed..

En marknadsundersökning om regelvirke : kvaliteter och kunduppfattningar

Today there is a widespread opinion that the woodmarket and the forest industry are dominated by a traditional way of thinking and not adapted to the customers of today; a lot of products are produced purely on routine. Also, there is a demand for improving the quality of sawn woodproducts. AB Karl Hedin wants to sort this out by increasingly adapt their products to the demands of the market, i.e. through introducing a short wallstud of standard length, "Hedinregeln". At tirst, the wallstud will be produced in lengths of 2,70 m and of guaranteed quality.

An assessment of public procurement of timber buildings : a multi-level perspective of change dynamics within the Swedish construction sector

The construction and use of buildings in the EU accounts for half of the EU?s extracted materials and energy consumptions, and a third of greenhouse gas emissions. In the past decade, the construction sector has responded to such concerns by focusing on post production energy efficiency. However, new findings indicate that upstream construction processes influence emissions significantly ? necessitating a shift in focus to include material choices and building processes.

Från 2D till BIM i ett trähusföretag : Transition from 2D-CAD to BIM in a timber frame home company

A prefabricated timber frame house previously built by Villafabriken AB has been modeled in Autodesk Revit Architectural, a 3D-program based on BIM-technology. This has been done tosee if it?s possible to produce the publications that Villafabriken demands from the designengineer?s work, and examine which possible extra values that may arise compared to traditional 2D-CAD drawing.BIM is short for Building Information Modeling. Everything is stored in a single database and a change in the project file is automatically updated across the project. BIM provides more than just drawings since information from the model can be retrieved in various ways such as lists and quantity schedules.It was possible to produce the publications that Villafabriken demanded using Revit, but BIM doesn?t only mean a new way of drawing, it also require a change in the company?s process were the information from the model is being used..

Industrialiserat byggande : Fältfabrikens användning, utveckling och framtid

The construction industry is currently receiving much criticism for inefficiency and slow development while demands for reduced built in moisture and efficiency increases. This report examines whether the use of field factories can meet these requirements and what factors that will be critical for future use of field factories. Industrialized construction with field factory is compared with traditional loose Timber construction and industrial construction in the fields of execution, logistics and working environment. The aim of this report is to provide a basis for field factories current and future use and development. To achieve the aim of the report, people with experience in the use of the various methods was interviewed and literature studies in the various fields done.

Enkätundersökning hos markägare inom SCA Skog Jämtlands förvaltning

This report is a joint venture with SCA Skog AB in the Jämtland forest management area. The company is a major player in the timber market in northern Sweden, and also a large business globally with offices in over 100 countries. The purpose of the study was to find out how timber suppliers want feedback/follow-up after completion of timber business. To determine this, a questionnaire survey was sent out to 75 landowners who supplied the wood for the company during the past year. The questionnaire consisted of a total of 15 questions with the opportunity to comment on certain issues.

Markägares val av skogspartner :

Derome Skog AB is a purchase company whose main task is to provide Derome Timber's sawmills in Halland with timber raw material. Because of the very hard competition in the roundwood market it is important to know what kind of purchase offers are required in order to buy a valuable product from forest owners.This study aims to elucidate the crucial factors when private forest owners choose to harvest and sell their forest. As base for this study, a questionnaire has been performed with private forest owners. The result of the study shows that it is not particularly often that the timber price is the crucial factor why the forest owners choose to harvest and sell the forest products; i.e. timber, pulpwood as well as energy assortments.

Kvalitetssäkring vid arbete med fukt i virke

There are many factors in a building project that has to collaborate with one another in order to reach the desired end result, how you work with moisture issues in timber is a very important one. While constructing Varbergs Hospital, the building company Skanska came in contact with the issue of extra high demands on the moisture content in timber. What they requested from us was a moisture program in which you clearly could follow the routines regarding work with moisture in timber. The aim is to use this program as a help during the work, in order to achieve a good result.We have developed this study in addition to the moisture program. The aim is that this study will give you a deeper understanding of the important factors to consider.

Uttag av kvalitetsvirke a björk - potential och problem

The purpose of this report is to illustrate potentials and problems with withdrawal of quality timber of birch. The purpose is also to describe possible ways to increase available quantities of quality timber. Former research is reviewed as introduction. The study begins with a prognosis of future volumes of birch timber based on consequence analyze by Swedish Forestry Agency. To illustrate the importance of active maintenance, two stands are estimated and simulated in the Heureka module StandWise.

Cross-Laminated Timber? En fallstudie av Hyttkammaren samt en jämförelse med prefabricerat betongelement ur platsomkostnadsperspektiv

Approximately ten people die every year at building sites in Sweden. Every year TheWork Environment Authority (Arbetsmiljöverket) receives 3200 accident reportsfrom the construction sector. The Swedish building contractor Skanska has the vision:?Zero accidents?. Only at Skanska Sweden, where this diploma work is preformed,350-520 accidents and mishaps are reported every year for the last 5 years.

Effekt av gödsling och gallring på mö?belvirke av furu

This thesis is about the effects of fertilizing and thinning on furniture timber from redwood. Interviews of furniture manufactures have been made and observing of timber from the Swedish fertilizing and thinning trails. The result from the interviews showed which properties that is important for the furniture manufactures and then the result from the observation showed which type of management of the forest that gave the most timber that had those properties. .

Marknadsundersökning av Södra skogsägarnas medlemmar inom Vimmerby verksamhetsområde

This thesis is based on a market survey sent to the passive members of Södra skogsägarna within the scope of practice of Vimmerby. A member of Södra skogsägarna is considered passive if the member not has delivered timber to the association during the past five years. The purpose of this thesis was to obtain as much information as possible about the forest owners, to be able to interpret why the member did not choose to deliver their timber to the association. The survey was worked out in close collaboration with Södra skogsägarna to answer this question. The responses indicate that economic returns are important to the individual landowner. The price of timber is most important in a timber business and the majority of forest owners want to have a personal meeting if you can choose how you wish to be contacted by the inspector.

Produktionsoptimering av Kv. Hunden

For many years, there has been a housing shortage in Sweden. Many have been expecting a construction boom in the housing sector, but that has yet to arrive. With the current legislations and guidelines surrounding modern, energy efficient housing; production costs have increased dramatically in recent years. As a result, having a negative effect on housing production despite the high demand for homes.This exam work is carried out on a construction project of Sjötorpshus AB and its purpose is to evaluate how to optimise the construction process for the production of a new residential settlement, "Kv.Hunden", located in Katrineholm. In an interview with the company's MD, Pär Knutsson, four main issues were defined to focus on.

Limnologen : Inblick i svenskt träbyggande

I Sverige fanns, mellan 1874 och 1994, ett förbud mot att bygga bostadshus med fler än två våningar i trästomme. Under denna tid försvann större delen av hantverks- och ingenjörskunnandet och man fick därför börja från början då förbudet hävdes. Byggandet gick till en början trögt, men tog fart i och med regeringens nationella träbyggnadsstrategi och utvecklandet av byggande med massivträ i början av 2000-talet. Limnologen i Växjö är ett bra exempel på hur långt fram Sverige ligger i utvecklingen, men det pekar också på områden inom tekniken som behöver förbättras.Den här uppsatsen behandlar översiktligt hur trähusbyggandet har sett ut i Sverige och beskriver sedan Limnologen med fokus på entreprenadform, stabilisering, brandskydd och akustik. Vidare beskrivs hur massivträtekniken har utvecklats och hur byggsystemet för massivträ har tagits fram..

Utvecklingsanalys av installationssystems montering vid industriellt träbyggande : Värme, vatten, ventilation, el och avlopp

The industrialized timber housing process is capable nowadays to build multi-storeyhouses since fairly new changes in the Swedish regulations where made after theadmission of the European Union in 1994.The industrialized process moves parts of the construction process into a highlyeffective factory where 3D-volumes of the building are prefabricated beforetransportation to the building site for assemble.The assembly process is relatively effective compared to the completion of thebuilding service system and this is therefore the main focus in this thesis. This thesisattends problems with completion of the building service system, and thereforedemarcates from other aspects, such as technical and economic aspects, of thebuilding service system.The degree of completion of the flats differs from completion of the connectivepassages, for example hallways, in a way that suggests a need for further investigation.This thesis includes analysis of the possibilities to increase the prefabricatedconnective passages, to the extent of containing building service systems.An increase of the prefabrication of the building service system has a greatdevelopment potential, even though some restraining factors need to be solvedbefore implementation.This thesis was made in collaboration with two of Sweden?s leading companies on themarket of multi-storey industrialized timber housing, Moelven ByggModul AB andLindbäcks Bygg AB..

1 Nästa sida ->